The Journey so far

New Beginnings

Sky view of the units

So much work to do!

A sneak peek of the warehouse

So much work to do!
This is inside Unit Four - it will be changed to a meeting room and classroom inshaAllah.

Stripping it all back

Breaking Unit Four
Unit 4 presented a significant challenge due to its solid construction. Through determination and teamwork, our volunteers were able to break through.

Opening the Space

Removing the Portacabin Roof

Waste management - skips
The substantial volume of waste generated by demolition was managed through the strategic use of skips for safe and efficient disposal.

Waste management - timber
To further optimise the budget, all salvageable timber was diverted for recycling or repurposed. Ensuring a cost-effective and responsible removal process.

Roof Refurbishment

Exterior Works

Steel Reinforcement – Sisters’ Side
Steel beams were fitted to provide vital structural support, allowing initial works on the sisters’ side to progress while planning approval is awaited.

Stud Walls – Sisters’ Side
New stud walls were installed to define the internal layout and prepare the space for future use.

Insulation – Sisters’ Side

Sisters’ Outer Doorway

Wiring & Plumbing – Sisters’ Side

Skimming the Walls

Utilities Infastructure
We’ve upgraded all our incoming utility infrastructure, including water, gas, and electricity, to ensure we can comfortably meet the needs of the Jamaat

Flooring
The uneven, multi stepped flooring has been corrected and laser-levelled precision to ensure a safe and uninterrupted flow for the young and elderly.

Frontage
The exterior was carefully revitalised to provide a fresh, modern look while improving energy efficiency and internal comfort.
Preparation Room
A much-needed flexible preparation area is now being set aside, allowing us to better support events community iftars, coffee mornings, and similar gatherings—no more taking over the Imam’s office